Claim and boundary review
Does the proposed message match the LCA scope, PCR, EPD type, geography, functional requirement, and data quality?
Sustainability & LCA — boundary-aware review
Independent technical review of asphalt and bitumen sustainability claims — LCA, EPD, recycling, softeners, modifiers, durability — before the number reaches a customer, an agency, or an executive.
where the claim stops and the assumptions begin
Carbon numbers matter, but they are not the whole asphalt decision. A sustainability claim can be wrong for purely technical reasons: an unclear LCA boundary, an outdated binder factor, a weak EPD comparison, an allocation assumption doing too much work, an additive with no aging data, or recycled-content language standing in for real circularity. KAT reads the evidence behind the claim and marks where the claim stops and the assumptions begin — so what you say publicly stays inside what you can defend.
the problem
Binder cradle-to-gate data, plant EPDs, haul distances, RAP credits, warm-mix benefits, use-phase assumptions, and end-of-life rules each measure something different. Marketed as a single figure, they produce a number nobody can trace. A defensible claim starts by knowing which question it actually answers — and staying inside that scope.
KAT's role is technical translation — what the number means, which assumptions control it, what evidence is missing, and how to say it without overselling.
what the boundary decides
what we review
Sustainability pressure usually arrives faster than the data to answer it. These modules turn that pressure into staged, credible action instead of a claim you later walk back.
Does the proposed message match the LCA scope, PCR, EPD type, geography, functional requirement, and data quality?
Bitumen carbon factors read in context: crude slate, refinery route, terminal operations, allocation, region, and how current the factor is.
Separating real circularity from recycled-content language via binder contribution, diffusion, softener strategy, stockpile quality, and performance risk.
Whether polymers, softeners, bio-derived streams, process oils, or waste-derived inputs carry compatibility and aging evidence.
The data technical and plant teams need before formal LCA modelling, EPD generation, or procurement submittals.
Technical limits turned into plain-language memos, talking points, and decision packages.
the check
Four questions decide whether a claim survives a technical reviewer.
the KAT position
The argument in Responsible Asphalt Production (PARC 2026) is that asphalt earns its place on environmental merit — when the sustainability case is built on evidence, not framing. That case holds on three conditions: it lowers impact, it protects reliable supply, and it verifies durability. Miss one and the claim may still be a sound direction of travel — but it should be qualified before it becomes a public promise.
“Asphalt is a choice, not a leftover — and a responsible claim is one built to survive the person who checks it.”
From “Responsible Asphalt Production,” PARC 2026 — see Publications →
deliverables & scope
Every engagement produces something a team can act on — not a lecture on methodology.
Scope note — KAT does not replace an accredited EPD program operator or a formal LCA practitioner where third-party-verified EPDs are required. KAT helps technical and commercial teams prepare, interpret, stress-test, and communicate the asphalt-specific evidence behind them.
related work
The worked LCA reality-check example shows how a single asphalt carbon figure changes once boundaries, RAP, warm mix, plant energy, binder factors, and performance confidence are handled honestly.
start here
Share the wording, the product or project boundary, the mix or binder context, and the decision it supports — we'll tell you where it stands.
Every engagement is confidential.